VIDEOS
Become a 1300TempFence Sub-Contractor

Welcome to the latest edition of 1300Tempfence’s ‘Beyond the Fence’ newsletter.
1300TempFence delivered 1,790m of 113km/h spec engineered temporary fencing across two stages for the Kuraby Station Precinct and Level Crossing Upgrade, alongside an active railway line.
1300TempFence delivered 104m of Shield 1 Water Filled Barriers (MASH TL-1) and 94m of SmartWall at Ngamawari Park (Acton Waterfront), Canberra ACT, maintaining safe pedestrian and cyclist access throughout active construction for Complex Co.


